Approval and Contract
After the acceptance of the project, the design selection is completed and the budget is approved, proposals and mutual agreements are signed and the production phase is started.
Shipment Application and Assembly
The contracted products transferred to the factory production units are produced according to the planned production and delivery schedule. After the quality controls made during the production stages and before shipment, the products are shipped to the assembly area by making appropriate packaging.
Security and Standards Control
At every stage of production, the materials and products used in production are controlled in accordance with quality standard norms, and the necessary documentation is prepared and archived.